PRINTING MACHINERY
KBA COMMANDER INSTALLATION
Description
Unloading by crane, forwarding and positioning by remote-controlled electric roller conveyors Apollo 50. Preparation for forwarding by crane through a passage on the wall, specially opened for the passage of the machine. Installation of the units with lifting by means of hydraulic hoppers and dedicated sling bars. Assembly of the printing units and alignment and pre-start positioning of the machine.
Location
Roma, Italy
Equipment
- Hydraulic gantries
- Crane
- Apollo 30
- Slingbars
- Precision, aligment and positioning tools